
Master Bathroom Renovation, HSR Layout
Persistent leakage into the bedroom wall. Previous renovation had skipped waterproofing entirely.
Stripped to slab, traced and corrected concealed plumbing, applied multi layer waterproofing, laid new tiles with corrected floor slope, installed premium sanitaryware and a glass shower enclosure.
Dry walls, correct drainage, and a bathroom the client says looks better than the one in the hotel that inspired it.



